Canyons School District

Brighton High School Rebuild


Rebuilding Brighton High School required careful coordination and strict safety procedures to construct the new, massive school within feet of the old one.  





Kelly Hall

Superintendent

One major challenge was cutting the building in half two different times and making sure all of the life safety systems and utilities stayed up and running to keep the existing building functional for students.

Project Success

We systematically replaced the high school on a 35-acre site with a 34-foot grade change.

I feel that at the core of everything we did throughout the build has been ‘What is best for students?’ It’s easy to expect that of educators. But to have the contractors also look through a project with an eye on students first was surprising and refreshing

Tom Sherwood

Director of High Schools

Canyons School District



Tight 35-acre on-site rebuild!

Project Awards

Associated General Contractors of Utah

2022 K12 Project of the Year

American Concrete Institute Intermountain

2023 Excellence in Concrete Award

Utah Masonry Council

2023 Excellence in Masonry Design


Persimmon

Brighton High School is a three-story next-generation learning environment with ample natural light and a collegiate aesthetic. It is designed and constructed to focus on openness, visibility, flexibility, collaboration, adaptability, and technology.


Raspberries

Project Stats

399,000

Square Feet

2022

Year Completed

Cottonwood Heights, UT

Location